Projects
Proven Stormwater Management Solutions
Discover how StormTrap systems and applications have provided effective solutions in stormwater management.
Discover how StormTrap systems and applications have provided effective solutions in stormwater management.
Location: Aiken, SC
Application: Detention and Infiltration
Number of Basins: 2
Product Used: 15’-0” DoubleTrap
Number of Pieces: Basin 1: 902 pieces, Basin 2: 368 pieces
Total Water Stored: 1,059,543 cf
Foundation: Stone
Owner: City of Aiken, SC
Consulting Engineer: McCormick Taylor
General & Installing Contractor: Thalle Construction Company
Read More
Location: Eagan, MN
Application: Infiltration and Treatment
Number of Basins: 1
Product Used: 8’-0” DoubleTrap & two 10′-0” SiteSaver
Number of Pieces: 98 + 10 panels
Total Water Stored: 38,269 cf
Foundation: Stone
Owner: City of Eagan, MN
Consulting Engineer: Stantec
General & Installing Contractor: Meyer Contracting
Read More
Location: Monona, WI
Application: Detention & Treatment
Number of Basins: 1
Product Used: 5’-8” SingleTrap
Number of Pieces: 32
Total Water Stored: 19,610 cf
Foundation: Stone
Owner: City of Monona, WI
Consulting Engineer: Strand Associates, Inc.
General & Installing Contractor: Daniels General Contractors
Read More
Location: Des Moines, IA
Application: Treatment, Detention & Infiltration
Number of Basins: 2
Product Used: 5’-8” SingleTrap & 10’ Downstream Defender
Number of Pieces: 78 each basin
Total Water Stored: 110,000 cf
Foundation: Stone
Owner: City of Des Moines, IA
Consulting Engineer: Kirkham Michael Inc.
General & Installing Contractor: S M Hentges & Sons Inc.
Read More
Location: St. Cloud, MN
Application: Treatment
Number of Basins: 1
Product Used: 10’-0’’ DoubleTrap with baffle/weir walls
Number of Pieces: 62
Total Water Stored: 29,438 cf
Foundation: Stone
Owner: City of St. Cloud, MN
Consulting Engineer: SEH, Inc.
General & Installing Contractor: R.L. Larson Excavating, Inc.
Read MoreLocation: Philadelphia, PA
Application: Detention
Product Used: 4′-9” SingleTrap
Total Water Stored: 251,653 cf
Number of Basins: 1
Number of Pieces: 455
Foundation: Concrete pad
Owner: Resource Environmental Solutions, LLC.
Consulting Engineer: Pennoni Associates, Inc.
Installing Contractor: American Siteworks, LLC.
Read MoreLocation: Wilson, NC
Application: Detention & Treatment (Sand Filter)
Product Used: 8’-4” DoubleTrap
Total Water Stored: 116,000 cf
Number of Basins: 1
Number of Pieces: 298
Foundation: Stone
Owner: City of Wilson, NC
Consulting Engineer: Bartlett Engineering & Surveying
General & Installing Contractor: Fred Smith Company
Read More
Location: Carson, CA
Application: Storage, Water Quality Improvement
Product Used: 14′-8” DoubleTrap
Total Water Stored: 589,903 cf | 13.54 acre-ft
Number of Basins: 1
Number of Pieces: 712
Foundation: Stone
Owner: City of Carson, CA
Consulting Engineer: Tetra Tech
General & Installing Contractor: OHL USA
Read More
Location: Glenview, IL
Application: Detention
Product Used: 4′-11” SingleTrap
Total Water Stored: 107,680 cf
Number of Basins: 2
Number of Pieces: 194
Consulting Engineer: Gewalt Hamilton Associates
General Contractor: W.B. Olson
Installing Contractor: Lenny Hoffman Excavating
Read More
Location: Newmarket, ON
Application: Detention and Sump
Product Used: DoubleTrap 1905mm; Sump Area – 2210mm & 2337mm
Total Water Stored: 1785m3
Number of Basins: 1
Number of pieces: 244
Foundation: Stone
Watertight system with liner
Consulting Engineer: Schaeffer Consulting Engineers
General Contractor: Con-Drain Co (1983) Ltd
Read More