Location: Exton, PA
Application: Infiltration
Product Used: 5’-0” SingleTrap
Total Water Stored: 21,270 CF
Number of Basins: 1
Number of pieces: 43
Foundation: Stone
Consulting Engineer: Edward B. Walsh & Associates, Inc.
Installing Contractor: Wexcon, Inc.
General Contractor: Allan Myers, Inc.