Location: Rockville, MD
Application: Detention
Number of systems: 2
Product used: 7’-2” DoubleTrap and 5’-2” SingleTrap
Number of pieces: 496 (440 Basin 1 and 56 Basin 2)
Total water stored: 199,167 CF (168,658 Basin 1 and 30,509 Basin 2)
Foundation: Stone (Basin 1) and Concrete (Basin 2)
Watertight System: Basin 2 (with liner)
Engineering Firm: ADTEK Engineers
General Contractor: Coakley & Williams Construction, Inc.
Installing Contractor: Ross Contracting, Inc.