575 Harwood

Project Details

A SingleTrap infiltration system was installed at 575 Harwood, a Net Zero logistics facility in Ajax, Ontario. The facility, developed by Triovest, presented a unique challenge, a shallow infiltration system with nearly 4m of cover was required. StormTrap engineered an infiltration system using 36 pieces, delivering a total of 158 m³ water storage. Installed by Abrocc Sewer & Watermain in September 2022, completed in a single day, allowing them to backfill and continue the project without delay.