New Trier High School Campus Renovations
Project Details
As part of New Trier High School’s Northfield Campus athletic modernization, StormTrap provided an underground stormwater management solution to support two new synthetic turf fields and a fitness path. The project featured a 5 acre-foot detention vault utilizing a 4′-3″ SingleTrap system on a stone base, delivering 223,042 cubic feet of stormwater storage beneath the athletic facilities while preserving valuable surface space for student and community use.
Challenge
The primary challenge was providing substantial stormwater storage within a shallow footprint that limited the system height to just 4′-3″. In addition, the vault had to be precisely engineered around the foundations for new athletic field goalposts while maximizing available underground storage capacity. The project also required modifications to an existing StormTrap installation without disrupting the broader site redevelopment.
Solution
StormTrap successfully met these constraints by leveraging its low-profile SingleTrap system and adapting the existing on-site infrastructure to accommodate the new goalpost foundations. The project demonstrates the flexibility and longevity of StormTrap’s solutions, as the original system installed in 2012 remained in excellent condition more than a decade later.