SWS Magazine March/April 2019 features Chattahoochee Technical College Project

Image of a magazine article titled "Detention System Meets Storage Needs of Technical College," showing a construction site with a stormwater detention system being installed underground.

An underground detention system and a SiteSaver treatment device were installed at the Chattahoochee Technical College to manage stormwater runoff on campus. Storm Water Solutions Magazine featured the project in its March/April 2019 issue. Click on the link below to read the case study.