Location: St. Cloud, MN
Application: Treatment
Number of Basins: 1
Product Used: 10’-0’’ DoubleTrap with baffle/weir walls
Number of Pieces: 62
Total Water Stored: 29,438 cf
Foundation: Stone
Owner: City of St. Cloud, MN
Consulting Engineer: SEH, Inc.
General & Installing Contractor: R.L. Larson Excavating, Inc.
Cities are pivoting to regional stormwater management systems to help alleviate flooding and to treat urban runoff prior to discharge into local waterbodies. The City of St. Cloud, Minnesota, is a leader in implementing stormwater best management practices which are supported by a robust City-managed planning, inspection and maintenance program. A great example of this is the Lake George Water Quality Improvement Project.
LAKE GEORGE
In recent years, Lake George, a centerpiece and gathering place for many community events in St. Cloud, has experienced algae blooms that have rendered the lake green in color with unpleasant odors. Due to the high concentration of phosphorous in the water and low water clarity, the Lake was included in the State’s Impaired Waters list.
The City took several measures to protect and improve the water quality of the Lake and its 125-acre watershed through the years. In 2017, the Lake George Sub-Watershed Assessment Plan and the Water Quality Improvement Implementation Plan were completed. These plans included an in-depth look at the causes of the Lake’s water quality impairment and the proposed treatment program, which comprised in-lake alum treatments and the construction of a stormwater management system to treat runoff before discharging into Lake George.
REGIONAL TREATMENT SYSTEM
The stormwater treatment system was installed in 2020 beneath an existing City parking lot in the northwest corner of Lake George. It includes a 10’-0” DoubleTrap underground basin, built with 62 modular pieces and 11 panels, that works as a wet detention pond and a downstream filtration system. Within the StormTrap basin, the water flows in a “U” shaped path with baffles and weirs strategically placed to settle total suspended solids and capture floatable materials. After being treated, water is slowly released into the Lake.
The basin’s capacity is 29,438 cubic feet of stormwater and treats runoff from 60 acres that previously discharged to the Lake untreated.
INITIAL CHALLENGES
During the design phase, the project team faced some challenges regarding space limitations, high groundwater, and poor soil conditions. The first challenge was that the area available to install the StormTrap basin under the parking lot in Eastman Park was extremely limited. “The layout of the system had to be strategically placed, sized, and rotated to avoid impacts to the existing park trail systems and the park Veterans Memorial Monument,” explained Noah Czech, Stormwater Compliance Specialist for the City of St. Cloud.
Another significant project consideration was related to the high groundwater. The system was placed adjacent to Lake George, which is the system’s receiving water. The groundwater elevation and existing storm sewer elevations dictated the available system depth and height. “There was little available separation between groundwater and lake high water elevations and existing storm sewer elevations, making the placement of the system challenging,” affirmed Czech. The design team worked with StormTrap to help establish the top elevation of the system to ensure adequate cover.
The poor soil conditions were the third concern that had to be addressed in the initial phases of the project. After a geotechnical investigation, poor soil conditions were found under the east end where the system was going to be placed. The final design required subgrade improvement prior to installing the basin.
All these challenges were successfully managed by the City of St. Cloud, SEH Inc., StormTrap, and R. L. Larson Excavating, Inc. through excellent teamwork and communication.
“StormTrap provided great communication with the City and contractor answering questions and ensuring a successful project,” stated Czech.
SUCCESSFUL IMPLEMENTATION
The system currently provides stormwater treatment for a 60 acre drainage area. According to the City of St Cloud, an estimated 29.7 pounds of phosphorus and 23,600 pounds of sediment are removed annually and kept from entering the Lake. The entire project was funded with a $697,000 Clean Water Fund grant received in partnership with Stearns County SWCD.
With the combination of all the treatment procedures implemented in Lake George, it is expected to exceed State water quality standards and be de-listed from Minnesota’s Impaired Waters list by 2022. City staff continues monitoring Lake conditions to meet water quality goals.