Location: Evanston, IL
Basin 1
Application: Retention VCBMP
Product used: 1′-9” SingleTrap
Number of pieces: 91
Total water stored: 21,822 ft3
Basin 2
Application: Detention
Product used: 5′-8” SingleTrap
Number of pieces: 128
Total water stored: 80,036 ft3
Project Engineer: Gewalt Hamilton Associates