Projects
Proven Stormwater Management Solutions
Discover how StormTrap systems and applications have provided effective solutions in stormwater management.
Discover how StormTrap systems and applications have provided effective solutions in stormwater management.
Location: Eagan, MN
Application: Infiltration and Treatment
Number of Basins: 1
Product Used: 8’-0” DoubleTrap & two 10′-0” SiteSaver
Number of Pieces: 98 + 10 panels
Total Water Stored: 38,269 cf
Foundation: Stone
Owner: City of Eagan, MN
Consulting Engineer: Stantec
General & Installing Contractor: Meyer Contracting
Read More
Location: Parker, CO
Application: Treatment
Product Used: SiteSaver (STSS-4 and STSS-7)
Owner: Town of Parker, Colorado
Consulting Engineer: RS&H, Inc.
General & Installing Contractor: Hamon Infrastructure, Inc.
Read MoreLocation: Los Angeles, CA
Application: Detention and Treatment
Product Used: 11′-4” DoubleTrap; (3) 10′-0” SiteSaver
Total Water Stored: 873,617 cf (Detention)
Number of Basins: 1
Number of Pieces: 1320
Consulting Engineer: TranSystems Corporation
General Contractor: William Charles/Structors Inc.
Read More
Location: Lisle, IL
Application: Infiltration and Treatment
Product Used: 11′-4” DoubleTrap
Total Water Stored: 65,619 cf
Number of Basins: 1
Number of Pieces: 114
Consulting Engineer: V3 Construction of Illinois
General Contractor: Arco Construction
Architect: PFB Architects
Read More
Location: Marietta, GA
Application: Stormwater Detention and Treatment
Product Used: 9′-0” DoubleTrap & SiteSaver
Total Water Stored: 28,033 CF
Number of Pieces (per basin): 66
Foundation: 6” stone base
Water Quality Flow: 4.32 CFS
Owner: Chattahoochee Technical College
Engineering Firm: Eberly & Associates Inc (Atlanta, GA)
General Contractor: McCarthy (Atlanta, GA)
Installing Contractor: Dennis Taylor & Co (Lawrenceville, GA)
Read MoreLocation: Jay, VT
Application: Water Quality – Debris & Sediment Removal
Product Used: SiteSaver STSS-4
Water Quality Flow: 3.11 CFS
Peak Flow: 24.90 CFS
Sedimentation Requirements: 80% TSS – OK-110
Owner: Jay Peak Resort
Installing Contractor: Dale E. Percy, Inc
Engineering Firm: VHB – South Burlington, VT
Read MoreLocation: Allentown, PA
Application: Stormwater Treatment
Peak Flow Rate: 15.00
Water Quality Flow Rate: 8.87 cfs (maximum) 80% Removal [OK-110]
Sediment Storage Capacity: 112 ft3
Read More
Location: Arlington Heights, IL
Application: Detention and Treatment
Product used: 5’-8’’ SingleTrap
Number of basins: 1
Number of pieces: 91
Total water storage: 58,836 cf
Owner: Arlington Heights School District 25
Consulting Engineer: Eriksson Engineering Associates, LTD.
Installing Contractor: Stark & Son Trenching Inc.
General Contractor: Nicholas & Associates
Read MoreLocation: Central Acceptance Facility – Baltimore County, MD
Read More