Big Detention in the Little ROW – Informed Infrastructure Webinar

Black background with thin white geometric lines forming abstract cube shapes in the lower right corner.

Urban stormwater management is a critical aspect of city planning, as it plays a pivotal role in ensuring public safety and preventing potential damage to property and infrastructure caused by flooding. This webcast will discuss “outside the box” thinking for urban stormwater mitigation, focusing on how large-scale underground detention systems can be effectively integrated within the public right-of-way beneath municipal streets. The presentation will center around two case studies from Lake Forest, Ill., and Glenview, Ill.

During this session, attendees will learn about each project’s history, alternative analysis, design and construction challenges, the inclusion of a stormwater lift station, and the recommended solutions. The webcast also will highlight the role of stakeholder engagement in shaping the outcome of these projects. Join us to gain insights into these innovative approaches to managing stormwater in urban environments.

Learning Objectives

– Review design considerations for underground stormwater detention facilities and learn how to solve site constraints while maximizing potential land use.
– Understand the common challenges associated with urban stormwater mitigation.
– Analyze the effectiveness of large-scale underground detention systems in relieving flooded areas within public right-of-way under municipal roads.
– Evaluate the impact of existing utilities on the constructability of underground stormwater detention systems.

 

Presenter Information

Matthew J. Moffitt, P.E., CFM, Associate Vice President, Water Resources & Natural Resources, Baxter & Woodman

Paul Siegfried, P.E., CFM, CPESC, Associate Vice President, Water Resources, Baxter & Woodman

 

Watch the Webinar 

Be the Future of Stormwater Management

Stay ahead of regulations and protect your community for decades to come. Building the future starts underground.

Concrete I-beams are stacked in a row, arranged parallel to each other.