Stormwater Management Treatment System – US Bank Stadium West Plaza – Minneapolis, MN

Black background with thin white geometric lines forming abstract cube shapes in the lower right corner.

Project Specifications

Application: Stormwater Treatment – Sand Filter

Product used: 4’-6” SingleTrap

 

Owner: Minnesota Sports Facilities Authority

General Contractor: LS Black Constructors

Engineering Firm: Pierce Pini + Associates

Installing Contractor:  United Water & Sewer

Be the Future of Stormwater Management

Stay ahead of regulations and protect your community for decades to come. Building the future starts underground.

Concrete I-beams are stacked in a row, arranged parallel to each other.