Wescott Park Stormwater Storage Facility: Village of Northbrook, IL

Black background with thin white geometric lines forming abstract cube shapes in the lower right corner.

Project Specifications

 

Application: Rainwater Harvesting System

Storage Capacity: 1,033,503cf / 23.77+acre-ft / 7,731,139 gal

Number of Pieces: 861 Units/ 1722 Pieces

 

Project Owner: The Village of Northbrook, Northbrook Park District

Green Infrastructure Partner: Metropolitan Water Reclamation District of Great Chicago (MWRD)

Engineering Firm: Baxter & Woodman

Installing Contractor: V3 Companies

Be the Future of Stormwater Management

Stay ahead of regulations and protect your community for decades to come. Building the future starts underground.

Concrete I-beams are stacked in a row, arranged parallel to each other.