Stormwater Detention and Treatment System: Second Street Youth Center – Plainfield, NJ

Project Specifications
Application: Stormwater Detention and Treatment System
Detention System
Product used: 4’-0’’ SingleTrap
Total Water Stored: 2,154 cf
Number of pieces: 7
Foundation: Concrete
Treatment Device – SiteSaver
Product used: SiteSaver STSS-4 WQ Flow Rate: 4.06 cfs Peak Flow Rate: 32.5 cfs
Owner: JG Petrucci Company / TD+Partners
Engineering Firm: E2 Project Management
General Contractor: Iron Hill Construction Management
Installing Contractor: Krutis Excavating, Inc.