Jane Byrne Interchange – Chicago, IL | Stormwater Detention System

Project Specifications

 

Application: Detention

Product Used: 14′-0” DoubleTrap

Total Water Stored: 213,458 cf

Foundation: Concrete

 

Owner: IDOT

Engineer: AECOM

Installing Contractor: Lorig Construction Co

Be the Future of Stormwater Management

Stay ahead of regulations and protect your community for decades to come. Building the future starts underground.

Concrete I-beams are stacked in a row, arranged parallel to each other.