Boston College – Athletic Field House | Stormwater Detention System

Project Specifications
Application: Detention
Product Used: 8′-4” DoubleTrap
Total Water Stored: 329,870 cf
Number of Pieces: 688
Foundation: Concrete Watertight System
Owner: Boston College
Consulting Engineer: Waterfield Design Group
General Contractor: Suffolk Construction
Installing Contractor: The Dow Company