Loyola Medical Center Stormwater Management Project – Maywood, IL

Black background with thin white geometric lines forming abstract cube shapes in the lower right corner.

*Video features stormwater detention basin (south basin) installed adjacent to 1st Avenue – primary access to Loyola Medical Center.

Project Specifications

 

North Basin

Application: Detention

Product Used: 5′-8” Singletrap

Number of Pieces: 50

Total Water Stored: 22,655 cf

 

South Basin

Application: Detention

Product Used: 5′-8” Singletrap

Number Of Pieces: 152

Total Water Stored: 91,295 cf

 

Owner: Chicago And Loyola University Health System Project

Engineering Firm: Smithgroup

Installing Contractor: Berger Excavating Contractors, Inc.

Drainage Infrastructure Partner: Metropolitan Water Reclamation District Of Greater Chicago (MWRD)